[Gluster-devel] 3.4 Beta Schedule?
Joe Julian
joe at julianfamily.org
Mon Dec 10 19:10:53 UTC 2012
Since EPEL upgraded to Folsom (breaking existing installs <grumble>...)
I don't really see a point in spending any time on essex for the rpm
based distros. Not sure about the dark side though.
On 12/06/2012 06:30 AM, Kaleb Keithley wrote:
>
> From: "Vijay Bellur" <vbellur at redhat.com>
>
>>> - there's been a lot of work on UFO/gluster-swift - do you know if this will be included? Or will that be released separately on its own schedule?
>> The release can be done separately as the UFO/gluster-swift changes are
>> not dependent on a specific release of GlusterFS. Kaleb, your thoughts
>> on this?
> Based on my email last week to this list and our scrum call this morning, we want to move to Folsom as soon as it's practical.
>
> Our tentative plan is to jump to Openstack Swift Folsom (1.7.4). Shortly, we'll put a new UFO tarball up on download.g.o based on this.
>
> Maybe we'll put up an intermediate tarball based on Essex (1.4.8) first?
>
> As those happen I'll package them for Fedora 18, and in my repo for earlier versions of Fedora.
>
> --
>
> Kaleb
>
> _______________________________________________
> Gluster-devel mailing list
> Gluster-devel at nongnu.org
> https://lists.nongnu.org/mailman/listinfo/gluster-devel
More information about the Gluster-devel
mailing list