[Bugs] [Bug 1512093] Value of pending entry operations in detail status output is going up after each synchronization.
bugzilla at redhat.com
bugzilla at redhat.com
Mon Nov 27 06:10:58 UTC 2017
https://bugzilla.redhat.com/show_bug.cgi?id=1512093
Aravinda VK <avishwan at redhat.com> changed:
What |Removed |Added
----------------------------------------------------------------------------
CC| |avishwan at redhat.com
Assignee|bugs at gluster.org |khiremat at redhat.com
--- Comment #3 from Aravinda VK <avishwan at redhat.com> ---
IO from mount stopped while running status command?
Entry count in status changes continuously as long as IO is going on in Master
volume. (Crawl -> Increment count -> Create entries in slave -> Decrement the
count)
This status column is not related to checkpoint. Only if no IO in Master mount
and status shows entry count then it might have some issue.
--
You are receiving this mail because:
You are on the CC list for the bug.
You are the assignee for the bug.
More information about the Bugs
mailing list